Okay, that when much smoother than expected.
I'm now able to pull information directly off of the google docs spreadsheet, which means that I can easily update all of the games with start/end times now and throughout the marathon to be able to set prize draw time delimeters. I just need to do a little more local testing to make sure everything works well, but I think its almost there.
That being said, I still think that we should split FFVII into two separate entities, since it would avoid a funky special case that I'm having to write in, and would just make everything a little cleaner IMO.
So..., UA do you mind if I do those changes? I'll run the SQL neccessary to update the db for it and everything, and it'll auto-fill the times on the run, so no manual data entry will be required for that, puwexil (yay for automation!).
I'm now able to pull information directly off of the google docs spreadsheet, which means that I can easily update all of the games with start/end times now and throughout the marathon to be able to set prize draw time delimeters. I just need to do a little more local testing to make sure everything works well, but I think its almost there.
That being said, I still think that we should split FFVII into two separate entities, since it would avoid a funky special case that I'm having to write in, and would just make everything a little cleaner IMO.
So..., UA do you mind if I do those changes? I'll run the SQL neccessary to update the db for it and everything, and it'll auto-fill the times on the run, so no manual data entry will be required for that, puwexil (yay for automation!).